Our employees have more than 15 years of experience in development of frac chemicals. The working temperature lies between 30 and 180°C. We are active in the on-shore area as well as in the off-shore area.
You will find detailed information in the product data sheets in our download area..
Production costs optimisation
For you, and your respective technological production terms we will find a matching, complete system, including:
Cost optimisation for known, or existing frac systems is important for us, too. Growing higher and higher proppant and gel quantities are an increasing expense factor for frac and oil production companies. Rising production depths mean increasing temperatures, and raise the requirement to the frac chemicals.
So, for example, temperatures above 140 °C require completely new systems of chemicals (see graphics).